Before installing the electric furnace dust remover, it is necessary to check:
1. When installing theelectric furnace bag dust remover, it is necessary to check whether the various accessories of the equipment are complete, whether the main machine is damaged, and whether the connecting parts are reliable. If there is any problem, it is necessary to wait for the solution before installing
2.Check whether there is noise or bad condition in the operation of the fan of the electricboiler bag-type dust collector. If so, adjust the fan before use
ElectricInstallation operation and steps of furnace dust remover:
1. When theelectricfurnace bag dust remover is installed outdoors, the dust remover shall be installed with rainproof cover or rainproof shed. This can extend the service life of the dust collector
2. When theelectricfurnace bag-type dust collector is placed, it should be placed on a flat and firm foundation, and the equipment should contact the ground
3. The input end of the electromagnetic pulse valve is inserted into the metal pipe of the gas reservoir, and its output end is inserted into the blowing pipe of the dust collector. The two ends of the valve are equipped with rubber sealing rings and fixing nuts. The electromagnetic pulse valve can be reliably fixed and sealed
4. For the working principle and installation and commissioning precautions of the electrical control system, see the operating instructions of the electrical control system
5. When installing the water separation filter pressure reducing valve, the arrow direction indicated by the water separation filter pressure reducing valve must be consistent with the flow direction of compressed air, and the outlet pressure of the pressure reducing valve should be adjusted to 0.4~0.6MPa
6. Pay attention to whether there is condensation in the bag room and whether the ash discharge system is smooth. Prevent blocking and corrosion, which will affect the production of the main engine in case of serious dust accumulation
7. Turn the arterial pulse knob, and the pulse injection controller sends instructions to open the electromagnetic pulse valve in sequence, and observe whether the ash cleaning action is correct< br/>