The cold test of the baler is an important step in the formal start-up stage of the unit. Before the cold test, the cold test process of the baler must be mastered and checked
1. Check whether the valve can be opened and closed normally and whether the valve position is correct
2. Set the control panel switch to the manual state, test the fan, reversing valve and quick valve, and ensure that the fan rotates in the correct direction, and the reverse valve and quick valve reverse flexibly
3. Select the automatic switch on the control panel to carry out the linkage test of all equipment to ensure that the display and interlocking meet the design
After the baler has been running continuously for 4-8 hours under the cold test, the hot test can be carried out next< br/>